Following are a set of P2 options you may wish to implement. No option is perfect for everyone, but sometimes options that have worked at one facility can work at yours. They might also serve as inspiration.


Unreviewed Options, Use with CautionUnreviewed Pipeline Condensate Accumulation Options

Options below have not been reviewed by pollution prevention specialists. They are commonly recommended and implemented for facilities.

 
Lower the dewpoint temperature
Invista is considering lowering the temperature of the gas as low as possible before it enters the pipeline. However, this project will take some time to design and may require a large amount of capital.
 
Reduce Acetylene Gas Flow
By reducing the acetylene gas flow in the pipeline, less condensate will condense out of the gas as the temperature drops to ground temperature.
 
Investigate Abnormally High Waste Generation Rates
If unusually high waste generation rates are noticed, the pipeline operator will contact Invista for Invista to investigate why the water rate has increased.



Find Options for other processes


Contact Us

P2 Network / Web Library / Directory / Topic Hubs™ / Search
Operated by MSU Extension Service / Funded by EPA Region 8 / Member P2Rx™


Has this publication been helpful to you?
Please email us about how this information helped you in your daily life: information@peakstoprairies.org
chanel taschen