Peaks to Prairies Pollution Prevention Center logo

email page

Web Library Region 8 P2 Network Region 8 P2 Programs Directory P2Rx Topic Hubs Search Web Site




Following are a set of P2 options you may wish to implement. No option is perfect for everyone, but sometimes options that have worked at one facility can work at yours. They might also serve as inspiration.

Reviewed Printshops - Spill Control Options

Options below have reviewed by pollution prevention specialists. They are commonly recommended and implemented for facilities.

 
Berm working areas with curbing
Berm working areas with curbing, similar to a concrete dike, so that spills can be easily contained for cleanup.
 
Manage placement of containers
Place storage containers in a convenient and safe place. Try to avoid moving waste long distances.
 
Use shop rags
Use shop rags for small spills and absorbent for larger spills. Absorbents should be easily accessible anywhere in the shop and may require disposal as hazardous waste, if saturated.
 
Use drain mats or plugs
Use drain mats or plugs to prevent spilled fluids from entering sanitary or storm drains, plus to help contain spilled fluids for cleanup. If possible, seal or remove unused floor drains to prevent accidental discharge to the sewer system.
 
Use drip pans
Place drip pans or absorbent mats under leaking equipment or where spills are likely to occur.




Find Options for other processes


Contact Us

P2 Network / Web Library / Directory / Topic Hubs™ / Search
Operated by MSU Extension Service / Funded by EPA Region 8 / Member P2Rx™


Has this publication been helpful to you?
Please email us about how this information helped you in your daily life: information@peakstoprairies.org
chanel taschen