Unreviewed P2 Options
| ||
Unreviewed Options for Wastewater TreatmentFollowing are a list of options that have been submitted by users of the pollution prevention planner. They have not been reviewed by pollution prevention specialists. These options are presented so you can see what people in facilities are considering. As with any option (reviewed or unreviewed) you will have to adapt it to your facility. |
||
Equipment Upgrade | ||
Replace outdated technology with newer more effecient technology. This minimizes chemical usage waste and improves consistency of the waste water treated. | ||
Housekeeping | ||
Prevent solids containing lead from entering the wastewater filtration building; thereby reducing lead in both wastewater and sludge. | ||
Run lead on alternate equipment | ||
To prevent lead from entering the wastewater stream, pursue option of running lead-based products on strand lines (as opposed to Gala lines). |