Unreviewed P2 Options
for the
Wash Water - Process equipment clean-up Process

Following are a set of P2 options you may wish to implement. No option is perfect for everyone, but sometimes options that have worked at one facility can work at yours. They might also serve as inspiration.

Unreviewed Options for Wash Water - Process equipment clean-up

Following are a list of options that have been submitted by users of the pollution prevention planner. They have not been reviewed by pollution prevention specialists.

These options are presented so you can see what people in facilities are considering. As with any option (reviewed or unreviewed) you will have to adapt it to your facility.

 

High pressure low volume nozzle heads

Evaluate installing high pressure low volume nozzle heads on our steam cleaning areas.
 

High pressure low volume nozzle heads

Evaluate installing high pressure low volume nozzle heads on our equipment washing areas.
 

Add metrics for daily reporting

Add waste water input counter to system to record daily input levels.
 

Joint Cement Manufacturing

Adding white and off-white wash water to the manufacturing of joint cement in place of clean water.
Find Options for other processes
image
/themes/hazel/demo7/wp-content/themes/hazel/
/themes/hazel/demo7/
#d8d8d8
style1
paged
Loading posts...
/home2/treethemes/public_html/themes/hazel/
#
on
none
loading
#
Sort Gallery
on
yes
yes
off
on
off